Republic of the Congo
Oil Production, Djeno and LNG
Key Takeaways
- •The Republic of the Congo produced about 260,000 b/d of crude in 2025 by OPEC's secondary-source count, below its 277,000 b/d OPEC+ required production.
- •Congo itself reported 271,000 b/d for 2025 and 300,000 b/d for September 2026, above OPEC's secondary-source estimates of 260,000 and 279,000 b/d (OPEC Monthly Oil Market Report, October 2026).
- •TotalEnergies EP Congo holds 63.5% of the Moho license after a swap with Trident Energy, which took over the Nkossa and Nsoko II fields when it bought Chevron's Congo unit in January 2025.
- •Eni's Congo LNG reached 3 million tonnes a year of capacity when the Nguya FLNG shipped its first cargo on February 7, 2026, joining the 0.6 million-tonne Tango FLNG (Eni).
- •The Djeno export terminal passed to state ownership when its concession expired in November 2020, and Law 18-2024 put it under a joint operating agreement with TotalEnergies as operator (Journal officiel).
Congo-Brazzaville, formally the Republic of the Congo, pumped 260,000 barrels per day (b/d) of crude in 2025 on OPEC's secondary-source count, 17,000 b/d short of its OPEC+ required production of 277,000 b/d. This year it has run closer to the line: 281,000 b/d in the second quarter, 276,000 b/d in the third and 279,000 b/d in September (OPEC Monthly Oil Market Report, October 13, 2026, checked November 2026).
Almost all of it comes from offshore fields near Pointe-Noire, and most of it leaves the country through one terminal, Djeno. The country joined OPEC in June 2018, the year its total liquids output reached a decade high of 347,000 b/d, the U.S. Energy Information Administration (EIA) says.
Three counts of Congo's crude output
There is no single production number for Congo. OPEC publishes two (its own average of outside estimates, and what the government reports), and the EIA publishes a third. They differ by tens of thousands of barrels a day, so the table puts them side by side.
| Period | OPEC secondary sources | Reported by Congo to OPEC | EIA estimate | Secondary sources against 277,000 b/d |
|---|---|---|---|---|
| 2024 | 253,000 b/d | 260,000 b/d | not in table | not shown (the 277,000 b/d level applies to 2025 and 2026) |
| 2025 | 260,000 b/d | 271,000 b/d | 240,000 b/d | 17,000 b/d under |
| Q1 2026 | 268,000 b/d | 282,000 b/d | 250,000 b/d | 9,000 b/d under |
| Q2 2026 | 281,000 b/d | 283,000 b/d | 270,000 b/d | 4,000 b/d over |
| Q3 2026 | 276,000 b/d | 286,000 b/d | 270,000 b/d | 1,000 b/d under |
| September 2026 | 279,000 b/d | 300,000 b/d | no monthly figure | 2,000 b/d over |
Sources: OPEC Monthly Oil Market Report, October 13, 2026, Tables 5-7 and 5-8. EIA Short-Term Energy Outlook, November 2026, Table 3d (rounded to 10,000 b/d). The 277,000 b/d figure is Congo's OPEC+ required production for 2025 and 2026.
Congo's own figure ran 14,000 b/d above the secondary-source average in the first quarter of 2026, and in September the government reported 300,000 b/d against OPEC's 279,000 b/d. The difference matters in practice: OPEC+ monitors conformity with the average of its seven approved secondary sources, not with what members report, so the first column of figures is the one that counts.
The EIA's count is lower again, by 6,000 to 20,000 b/d a quarter. Its November 2026 outlook lists Congo at 0.24 million b/d for 2025 and 0.27 million b/d for both the second and third quarters of 2026. For a wider view of how these countries stack up, see our world oil production tables.
Below the 277,000 b/d line most of the time
Under the decision of the 38th OPEC and non-OPEC Ministerial Meeting on December 5, 2024, Congo's required production for 2025 and 2026 is 277,000 b/d. The 40th meeting in November 2025 and the 41st in June 2026 kept the overall production levels in place until December 31, 2026.
Congo has mostly lived under that ceiling. Its neighbor Gabon has pumped tens of thousands of barrels a day above its own 177,000 b/d number for most of 2026, while Congo's secondary-source output has crossed 277,000 b/d only in the second quarter and in September. For Congo the quota has been a ceiling it rarely reaches, not a cut it has to make. It is also outside the group of seven (Saudi Arabia, Russia, Iraq, Kuwait, Kazakhstan, Algeria and Oman) whose voluntary adjustments have steered OPEC+ supply through 2026.
The quota itself is about to be reset. The ministers approved a mechanism in November 2025 to assess each country's maximum sustainable production capacity, to be used as the reference for 2027 baselines, and the June 2026 meeting called for that assessment to be completed. The 42nd ministerial meeting is set for November 29, 2026. Our explainer on how OPEC+ sets required production covers how baselines, voluntary cuts and compensation fit together, and our guide to reading the OPEC monthly report shows where the secondary-source and direct-communication tables sit.
Who runs Congo's fields after the 2025 asset swaps
Four companies account for most of Congo's oil. Ownership changed in 2024 and 2025, and several older summaries still list Chevron, which sold its Congo unit in January 2025.
| License or field | Operator and partners | What the operator has published |
|---|---|---|
| Moho (Moho-Bilondo and Moho Nord), deep water about 80 km off Pointe-Noire | TotalEnergies EP Congo 63.5% (operator), Trident Energy 21.5%, SNPC 15% | Two floating production units, Alima and Likouf, producing around 100,000 boe/d gross in April 2024 (TotalEnergies) |
| Nkossa and Nsoko II, about 70 km offshore | Trident Energy 85% (operator), SNPC 15% | Started in 1996 and 2006, about 15,000 boe/d gross in April 2024 (TotalEnergies) |
| Lianzi, on the Congo and Angola boundary | Trident Energy 15.75%, with other partners | Congo's first cross-border development (EIA) |
| Tchibouela East, Masseko, Foukanda and other shelf fields | Perenco Congo (operator), with partners | Five Tchibouela East infill wells added 6,000 b/d by the end of 2025, and a five-well Masseko campaign began in 2026 (Perenco Congo) |
| Marine XII (Nene, Litchendjili) | Eni Congo (operator), with partners | Eni's equity output in Congo was about 70,000 boe/d in 2025, with 110,000 boe/d expected in 2026 (Eni) |
The swap was signed in April 2024 and completed on January 15, 2025. TotalEnergies EP Congo, 85% owned by TotalEnergies, bought another 10% of Moho from Trident and handed Trident its 53.5% share of Nkossa and Nsoko II. The deal only closed once Trident had bought Chevron's Congo subsidiary, which held 31.5% of Moho-Bilondo and of Nkossa and Nsoko II, according to trade-press reports of the completion. Trident said the acquisition would add about 30,000 b/d to its output.
Moho is the field that decides the national total. Moho Nord came on stream in 2017 and, with Eni's Nene Marine and the Lianzi field, drove the climb of the late 2010s, the EIA's country brief notes. In 2024 it produced around 100,000 boe/d gross, against national crude output of 253,000 b/d, and no other operator has published a gross rate that large for a single Congolese license.
Perenco works the other end of the scale: old shelf fields kept alive with new wells. Perenco Congo said in May 2026 that Tchibouela East has been producing for almost 30 years. Its Foukanda field, bought from Eni in March 2024, restarted on September 15, 2026 at 2,000 boe/d after Perenco laid a 13 km pipeline so that the field no longer depends on Eni's Kitina platform route to Djeno, Offshore Engineer reported.
How long 1.8 billion barrels lasts at today's pace
The EIA put Congo's proved crude reserves at 1.8 billion barrels at the start of 2024. A reserves-to-production ratio shows what that means at current output.
Worked example. Inputs: proved reserves of 1.8 billion barrels (EIA, January 2024) and 2025 production of 260,000 b/d (OPEC secondary sources).
- Annual production: 260,000 b/d × 365 days = 94.9 million barrels.
- Reserves divided by annual production: 1,800 million ÷ 94.9 million = about 19 years.
At Congo's own reported rate of 271,000 b/d the answer falls to about 18 years. The figure is a ratio, not a forecast. Reserves estimates move as fields are drilled and prices change, and the EIA notes the 1.8 billion figure was unchanged from the year before.
The same arithmetic shows what the quota gap was worth. Producing 17,000 b/d below the 277,000 b/d requirement through 2025 adds up to about 6.2 million barrels (17,000 × 365) that Congo was allowed to pump but did not.
The crude Congo sells
Congo exports three main blends, the EIA reports, citing Vortexa and TotalEnergies data.
| Blend | API gravity | Sulfur | What it is |
|---|---|---|---|
| Djeno | 26.4° | 0.54% | Medium, sweet, the main export grade |
| N'Kossa | 42.4° | 0.04% | Very light and sweet, a mix of N'Kossa and Kitina crude, small volumes |
| Yombo | 16.7° | 0.34% | Heavy, sweet and viscous, sold mainly to blending hubs in Singapore and Malaysia |
Djeno and Yombo are both sweet, so the difference between them is mostly gravity. Our guide to API gravity and sulfur explains how those two numbers move what a cargo sells for against Brent.
Djeno: a terminal the state took back
The Djeno terminal near Pointe-Noire handles most of the country's crude. Its legal history is set out in Law 18-2024 of August 16, 2024, published in the Journal officiel, which approved a new operating agreement signed on July 24, 2024.
Elf Congo, later TotalEnergies EP Congo, was authorized to run the terminal by a ministerial order (arrêté) of March 29, 1972. The historic concession, held 63% by TotalEnergies EP Congo and 37% by Eni Congo, expired on November 17, 2020, and ownership passed to the state. A December 2020 protocol gave the running of the terminal to a group of four: the national oil company SNPC, TotalEnergies EP Congo, Eni Congo and Perenco Congo, with TotalEnergies EP Congo chosen as operator. A December 2022 decree put the terminal into the state's public domain. The agreement describes cargoes leaving through one of two loading buoys.
So when a company calls Djeno "its" terminal, read that as operator, not owner. TotalEnergies' own country page, updated in October 2026, describes Djeno as operated by TotalEnergies and says the company supplies crude to the Pointe-Noire refinery.
Gas gets an export route: Congo LNG
Until late 2023 Congo had no way to export gas. The EIA's 2024 brief says the country used all the gas it marketed at home and flared about 64 billion cubic feet in 2022, by World Bank figures, with much of the rest reinjected into oil fields. Dry gas production averaged about 28 billion cubic feet a year between 2013 and 2022, against proved gas reserves of about 10 trillion cubic feet.
Eni's Congo LNG project changed that in two steps. The Tango FLNG, with 0.6 million tonnes a year of capacity, started in December 2023 and had exported 12 cargoes by August 2025. The Nguya FLNG, 2.4 million tonnes a year, came on stream on December 2, 2025 and loaded its first cargo on February 7, 2026. Together they give the project 3 million tonnes a year, which Eni equates to 4.5 billion cubic meters of gas a year, from the Nene and Litchendjili fields in the offshore Marine XII license.
4.5 billion cubic meters is about 159 billion cubic feet (at 35.3 cubic feet per cubic meter). That is more than five times the average dry gas output the EIA counted for 2013 to 2022. Eni expects its own Congo production to rise from about 70,000 boe/d in 2025 to 110,000 boe/d in 2026. Eni also supplies gas to the Centrale Electrique du Congo, which it says provides around 70% of the country's power generation capacity. For how the cargoes are priced, see our comparison of Henry Hub, TTF and JKM.
One small refinery for the whole country
Congo refines very little of its own crude. La Congolaise de Raffinage (CORAF) in Pointe-Noire has a nameplate capacity of 21,000 b/d, the EIA reports, citing the Oil & Gas Journal. That is under a tenth of national crude output. The government signed an agreement with Beijing Fortune Dingsheng Investment to build a 110,000 b/d refinery in Pointe-Noire in two phases, and the EIA's 2024 brief said it was scheduled to start that year. We found no official announcement that it has started.
Angola, the larger producer across the Lianzi boundary, left OPEC at the start of 2024, while Congo has stayed in. The OPEC members list has the dates for every member that joined or left.
Congo-Brazzaville oil, answered
How much oil does the Republic of the Congo produce?
About 260,000 b/d of crude in 2025 by OPEC's secondary-source count, rising to 281,000 b/d in the second quarter of 2026. Congo's own reports to OPEC are higher, at 271,000 b/d for 2025, and the EIA's are lower, at 240,000 b/d.
Is the Republic of the Congo in OPEC?
Yes. It joined in June 2018, and the EIA's November 2026 outlook lists it among OPEC's 11 members. Its OPEC+ required production for 2025 and 2026 is 277,000 b/d.
Who is the biggest oil producer in Congo-Brazzaville?
TotalEnergies EP Congo, which operates the Moho fields and calls itself the country's number one oil operator. Eni is the main gas producer, and Trident Energy and Perenco operate other offshore fields.
What is the difference between Congo-Brazzaville and the DRC for oil?
They are different countries. The Republic of the Congo, capital Brazzaville, is the OPEC member covered on this page. The Democratic Republic of the Congo, capital Kinshasa, is not on OPEC's list of 11 members, and none of the figures here apply to it.
Does Congo export LNG?
It has since early 2024. The Tango FLNG shipped Congo's first cargoes, and the larger Nguya FLNG loaded its first on February 7, 2026, giving Eni's project 3 million tonnes a year of capacity.
When did Congo's oil output last peak?
On the EIA's count, total liquids output hit a decade high of 347,000 b/d in 2018, after Moho Nord came on stream. It averaged about 273,000 b/d from 2014 to 2023.
References
- OPEC. Monthly Oil Market Report, October 13, 2026, Table 5-7 (DoC crude oil production based on secondary sources) and Table 5-8 (OPEC crude oil production based on direct communication). https://www.opec.org/assets/assetdb/momr-october-2026.pdf
- OPEC. 38th OPEC and non-OPEC Ministerial Meeting, press release and required production table for 2025 and 2026, December 5, 2024. https://www.opec.org/pr-detail/28-05-dec-2024.html
- OPEC. 40th OPEC and non-OPEC Ministerial Meeting, press release, November 30, 2025. https://www.opec.org/pr-detail/582-30-november-2025.html
- OPEC. 41st OPEC and non-OPEC Ministerial Meeting, press release, June 7, 2026. https://opec.org/pr-detail/605-7-june-2026.html
- OPEC. Press release on the meeting of seven OPEC+ countries, October 4, 2026. https://opec.org/pr-detail/1891616-4-october-2026.html
- U.S. Energy Information Administration (EIA). Short-Term Energy Outlook, November 2026, Table 3d (world crude oil production). https://www.eia.gov/outlooks/steo/tables/pdf/3dtab.pdf
- EIA. Country Analysis Brief: Congo Brazzaville (Republic of the Congo), May 2, 2024. https://www.eia.gov/international/content/analysis/countries_long/Congo-Brazzaville/pdf/Congo-Brazzaville_FY2024.pdf
- TotalEnergies. "Republic of Congo: TotalEnergies increases its interest in giant field Moho and divests two mature assets," April 24, 2024. https://echanges.dila.gouv.fr/OPENDATA/AMF/BWR/2024/04/FCBWR156496_20240424.pdf
- TotalEnergies. TotalEnergies in the Republic of the Congo (country page, modified October 12, 2026). https://totalenergies.com/republic-congo
- Drilling Contractor (trade press, reporting Trident Energy's announcement). "Trident Energy completes Republic of Congo acquisition," January 2025. https://drillingcontractor.org/trident-energy-completes-republic-of-congo-acquisition-71374
- Eni. "Nguya FLNG ready for Phase 2 of the Congo LNG project," August 2025. https://www.eni.com/en-IT/media/press-release/2025/08/nguya-flng-ready-for-phase-2-of-congo-lng-project.html
- Eni. "Eni launches the Phase 2 of Congo LNG ahead of schedule," December 2, 2025. https://www.eni.com/en-IT/media/press-release/2025/12/pr-eni-launches-phase-2-congo-lng.html
- Eni. "The President of the Republic of Congo, Denis Sassou N'Guesso, and Eni's Chief Executive Officer, Claudio Descalzi, celebrate the first LNG cargo from Phase 2 of Congo LNG," February 7, 2026. https://www.eni.com/en-IT/media/press-release/2026/02/president-congo-and-eni-celebrate-first-lng-cargo.html
- Eni. Our work in the Republic of Congo (country page). https://www.eni.com/en-IT/actions/global-activities/republic-congo.html
- Perenco Congo (announcement carried by Energy-pedia). Completion of the drilling campaign on the Tchibouela East field, offshore Republic of Congo, May 15, 2026. https://www.energy-pedia.com/news/congo-brazzaville/completion-of-its-successful-drilling-campaign-on-the-tchibouela-east-field--offshore-republic-of-congo-203936
- Offshore Engineer (trade press). "Perenco Brings Congo's Foukanda Offshore Oil Field Back Online," October 21, 2026. https://www.oedigital.com/news/543816-perenco-brings-congo-s-foukanda-offshore-oil-field-back-online
- Journal officiel de la République du Congo. No. 14-2024, Law 18-2024 of August 16, 2024 approving the operating agreement for the Djeno terminal (French). https://sgg.cg/JO/2024/congo-jo-2024-14-sp.pdf