Australia
LNG Exports, Gas Projects and Oil Production
Key Takeaways
- •Third-largest LNG seller: 81.2 million tonnes exported in 2024, 19.6% of world LNG exports, from WA, Queensland and NT plants (Geoscience Australia).
- •LNG exports were 78.7 million tonnes worth A$57.6 billion in the 12 months to March 2026, down 1.0% in volume after a North West Shelf train shut (ABS via WA government).
- •The three Gladstone LNG plants used 75% of all gas consumed in the east coast market in 2025 (AEMO, 2026 Gas Statement of Opportunities).
- •Draft laws would make LNG exporters reserve up to 20% of exports for local buyers from January 1, 2028 and repeal the ADGSM export control (exposure draft, September 2026).
- •Crude output was 27.6 million barrels in 2024, about 75,000 b/d, and Australia imported about 95% of its oil needs (Geoscience Australia).
Where Australia ranks among LNG sellers
Only the United States and Qatar shipped more liquefied natural gas in 2025. Geoscience Australia counts 81.2 million tonnes (Mt) of LNG exported in 2024, worth A$67.4 billion and equal to 19.6% of world LNG exports, which made Australia the third-largest seller that year (checked November 23, 2026). The Western Australian government's May 2026 LNG profile names the US as the largest exporter in 2025, at 109 Mt, and Qatar second, and it says the three countries together supplied 63% of global LNG exports.
Volume has barely moved for five years. What has moved is the price, and with it the export bill. The latest national figure, compiled by the WA government from Australian Bureau of Statistics (ABS) trade data, is 78.7 Mt in the 12 months to March 2026, 1.0% less than a year earlier, worth A$57.6 billion. The WA profile puts the small drop down to one North West Shelf train that stopped producing in 2025.
| Period | LNG exported | Export value | Source |
|---|---|---|---|
| 2021-22 (fiscal year, record) | 83.2 Mt (4,637 PJ) | not stated | Geoscience Australia |
| 2023-24 (fiscal year) | 4,509 PJ | A$68.6 billion, down 25.6% | Geoscience Australia |
| 2023 (calendar year) | 80.7 Mt (4,388 PJ) | not stated | Geoscience Australia |
| 2024 (calendar year) | 81.2 Mt (4,420 PJ) | A$67.4 billion, down 9% | Geoscience Australia |
| 12 months to March 2026 | 78.7 Mt | A$57.6 billion, down 11.6% | ABS data via WA government |
Counts differ by who is measuring. GIIGNL, the importers' group, records LNG at the receiving end, while the ABS counts it as it leaves Australia, so the two series do not match and should not be mixed. Compare like with like when you set Australia against Qatar or the US.
Gas is the big export and oil a small one. Total gas production was 6,353 petajoules (PJ), or 5.65 trillion cubic feet, in 2024, and about 70% of it left the country as LNG, Geoscience Australia says. Crude oil production was 27.6 million barrels the same year.
Ten export plants on three coasts
Australia's LNG comes from ten plants. Five sit in Western Australia on gas from the Carnarvon and Browse basins. Two are in Darwin in the Northern Territory. Three share Curtis Island at Gladstone in Queensland and run on coal seam gas piped from the Bowen and Surat basins.
| Plant | Location | Capacity | First LNG | Notes |
|---|---|---|---|---|
| North West Shelf (trains 1 to 5) | Burrup Peninsula, WA | 14.4 Mtpa | September 1989 | Train 2 isolated from the plant since January 2025. Federal approval to run to 2070 granted September 2025 |
| Pluto Train 1 | Burrup Peninsula, WA | 4.9 Mtpa | April 2012 | Being modified to take up to 3 Mtpa of Scarborough gas |
| Gorgon (3 trains) | Barrow Island, WA | 15.6 Mtpa | March 2016 | Final investment decision on Stage 3 (Geryon and Eurytion fields) in December 2025 |
| Wheatstone (2 trains) | Ashburton North, WA | 8.9 Mtpa | October 2017 | Train 2 added June 2018 |
| Prelude FLNG | Browse Basin, offshore WA | 3.6 Mtpa | June 2019 | Crux field to feed it from 2027 |
| Ichthys LNG (2 trains) | Darwin, NT | 427 Bcf/yr | 2019 | Operating in 2025 |
| Darwin LNG | Darwin, NT | 178 Bcf/yr | 2006 | Now supplied from the Barossa field. First Barossa cargo left January 25, 2026 |
| Queensland Curtis LNG (2 trains) | Curtis Island, Qld | 408 Bcf/yr | 2015 | Operating in 2025 |
| Australia Pacific LNG (2 trains) | Curtis Island, Qld | 432 Bcf/yr | 2016 | Operating in 2025 |
| Gladstone LNG (2 trains) | Curtis Island, Qld | 374 Bcf/yr | 2015 and 2016 | Operating in 2025 |
Sources: the five WA plants are from the WA Department of Energy and Economic Diversification's Western Australia LNG Profile (May 2026), in million tonnes per annum (Mtpa). The NT and Queensland plants are from the EIA Australia country brief (December 2025), which cites the International Gas Union's 2025 World LNG Report, in billion cubic feet per year (Bcf/yr). The Barossa date is from Santos. The EIA table lists only two Gorgon trains, so the WA figure is used for Gorgon.
Ownership is concentrated. In 2025 Chevron produced 33% of Western Australia's LNG, Woodside 25% and Shell 16%, the WA profile says. Chevron operates Gorgon (47.3%) and Wheatstone (64.14%). Woodside operates the North West Shelf, where it holds a third, and Pluto (90%). Shell operates Prelude (67.5%) and holds a quarter of Gorgon. A December 2024 swap would give Woodside Chevron's North West Shelf stake and Chevron Woodside's Wheatstone stake, and was expected to close in 2026. In the Northern Territory, INPEX operates Ichthys and Santos supplies Darwin LNG from the offshore Barossa field.
Putting both capacity units on one scale
The two sources use different units, so here is the conversion with every input shown.
Step 1: find the ratio from plants that appear in both sources. Prelude is 3.6 Mtpa in the WA profile and 173 Bcf/yr in the EIA table: 173 ÷ 3.6 = 48.1 Bcf per million tonnes. Wheatstone is 8.9 Mtpa against 214 + 214 = 428 Bcf/yr: 428 ÷ 8.9 = 48.1 again. We use 48.
Step 2: convert the other plants. Queensland Curtis 408 ÷ 48 = 8.5 Mtpa. Australia Pacific 432 ÷ 48 = 9.0 Mtpa. Gladstone LNG 374 ÷ 48 = 7.8 Mtpa. Ichthys 427 ÷ 48 = 8.9 Mtpa. Darwin 178 ÷ 48 = 3.7 Mtpa. Together that is about 37.9 Mtpa outside WA, about 25 Mtpa of it at Gladstone.
Step 3: add WA. The WA profile puts the state's capacity at about 47 Mtpa. That gives Australia roughly 85 Mtpa of nameplate capacity.
Step 4: compare with what shipped. 81.2 Mt exported in 2024 is about 96% of 85 Mtpa. The same ratio turns 81.2 Mt into about 3,900 Bcf a year, or 10.7 Bcf a day, which matches the 3.9 trillion cubic feet of 2024 LNG exports in the EIA brief.
Australian plants already run near full. Extra exports need extra trains, and the only new train on the WA government's list of committed projects is Pluto Train 2. With North West Shelf Train 2 shut, the realistic ceiling in 2025 and 2026 sits a little below 85 Mtpa. For how liquefaction capacity and contract terms set export volumes in general, see our LNG export dynamics primer.
Who buys Australian LNG
All of it goes to Asia. In 2024 China took 33% of Australia's LNG exports, Japan 32% and South Korea 14%, according to the EIA brief.
Western Australia publishes its own split, for 2025:
| Buyer | Share of WA LNG exports, 2025 | WA's share of that buyer's LNG imports |
|---|---|---|
| Japan | 41% | about 29% |
| South Korea | 21% | about 20% |
| China | 17% | about 12% |
| Taiwan | 12% | not stated |
| Thailand | 4% | not stated |
Source: WA LNG Profile, May 2026, citing EnergyQuest.
The years differ, so treat this as a rough read: China is a much smaller customer for the WA plants than for Australia as a whole, which puts most of China's volume on the Queensland and Northern Territory plants. Japan has bought WA gas since the first North West Shelf cargo in 1989, and the Japan profile shows how heavily its LNG supply leans on Australia. South Korea and China are the other two large buyers.
Most Asian LNG trade runs on long-term contracts with prices linked to oil, which is why the WA government says average Asian LNG prices follow crude with a lag of three to four months. Western Australia's 2025 LNG sales were 44.3 Mt, worth A$31.9 billion, 10.7% less than in 2024.
Eight days to Tokyo: why 2026 favored Australian cargoes
Fighting in the Middle East disrupted shipping through the Strait of Hormuz in March 2026, and the EIA estimates that cut off about 20% of global LNG supply that month. Asian buyers take about 80% of Qatar's LNG, so the gap opened in Australia's own markets. The JKM spot price for Northeast Asia averaged US$15.56 per MMBtu in the first half of 2026, the highest half-year since 2022, the EIA says. The WA profile records the front-month JKM at US$18.30 at the end of May 2026, against US$10.73 at the end of February.
Australian plants were already running near capacity, so they could not ship much more gas. What they offered was a short voyage that avoids the Gulf.
| Days at sea to | From Dampier, WA | From Gladstone, Qld | From Ras Laffan, Qatar | From Corpus Christi, US |
|---|---|---|---|---|
| Tokyo | 8 | 8 | 14 | 20 |
| Shanghai | 7 | 9 | 12 | 22 |
| Incheon | 8 | 9 | 13 | 22 |
| Taiwan (Yun-An) | 6 | 8 | 11 | 22 |
| Kochi, India | 7 | 11 | 4 | 21 |
Source: WA LNG Profile, May 2026, at 19.5 knots, rounded to whole days.
India is the one large buyer closer to Qatar. For the three price benchmarks behind these cargoes, see Henry Hub vs TTF vs JKM, and for the chokepoint itself, our Strait of Hormuz flows explainer. The US LNG export terminals guide covers the American plants that compete with Australia for Asian contracts.
The east coast: export plants that use most of the gas
Australia has two separate gas markets. Western Australia's is isolated and has a reservation rule: under the state's Domestic Gas Policy, LNG exporters must make gas equal to 15% of their exports available to local users. The east coast market, which joins Queensland to the southern states by pipeline, has no equivalent rule yet.
The scale is the problem. In 2025, gas used by the Queensland LNG export plants was 75% of all gas consumed in the east coast market, AEMO says in its 2026 Gas Statement of Opportunities (GSOO), published in March 2026. Its forecast assumes those plants export an average of 1,253 PJ a year under long-term contracts and another 85 PJ in spot sales through 2035. Coal seam gas from the Bowen and Surat basins was 1,665 PJ of Australia's 2024 output, Geoscience Australia says, and at 2024 rates its reserves last about 17 years.
Southern supply is the weak point. AEMO says production from southern fields is declining, and the Longford gas plant in Victoria's Gippsland Basin is in its final years of operation. The 2026 GSOO pushed the first risks of extreme peak-day shortfalls and annual gaps in southern Australia a year later than the 2025 edition did, but it still says new investment is needed to cover supply gaps from 2030 under most weather conditions. The report did not model the 2026 Middle East conflict.
Prices tell the same story from another angle. ABS producer price data cited by the WA government show domestic gas extraction prices in Western Australia fell 3.6% between the March quarters of 2025 and 2026, while east coast prices rose 1.8%. WA's prices have held steadier for a decade. On the east coast, the Queensland LNG ramp-up of the late 2010s and the 2021 to 2023 world price spike both fed into local prices.
From the ADGSM to a 20% reservation rule
Two tools have managed east coast supply so far. The Australian Domestic Gas Security Mechanism (ADGSM) is an export control, set in the Customs (Prohibited Exports) Regulations 1958, that gives the government a power to restrict LNG exports. The Heads of Agreement is a deal that sets domestic supply commitments for the Gladstone LNG producers. The federal Gas Market Review, whose report came out in December 2025, examined both along with the Gas Market Code, AEMO notes. Its main recommendation was a domestic gas reservation scheme, with the ADGSM, the Heads of Agreement and the Code's pricing provisions considered for removal.
The draft law followed. On September 10, 2026 the government released exposure drafts of a Domestic Gas Reservation Bill 2026, a levy bill and a consequential amendments bill. Law firm Clayton Utz summarized their main terms on September 14, 2026:
- License holders would supply 20% of covered LNG exports, measured by energy content, to the domestic market. The share can be set lower, based on forecast domestic demand, but not higher.
- The licensing framework would start January 1, 2027. Export licenses, domestic supply obligations and the cost-recovery levy would start January 1, 2028.
- The scheme would cover every LNG exporter from Australian territory, not just Gladstone. The Greater Sunrise area and LNG sold as ship fuel are excluded.
- Contracts signed on or before December 22, 2025 are not automatically exempt. Exporters can apply for an adjustment.
- The ADGSM would be repealed from January 1, 2028.
The bills then went to a Senate Economics Legislation Committee inquiry, which received a submission from Woodside dated October 23, 2026. Woodside backed the aim but argued that recalculating the obligation every year "provides no certainty" for long-term LNG contracts and investment. We could not confirm from the parliamentary record that the bills had passed as of November 2026. Allens, another law firm, reported in December 2025 that a short extension of the Heads of Agreement was being negotiated to cover the period before the scheme starts.
For export volumes, 20% is a ceiling, not a forecast. The draft text quoted in Woodside's submission lets the minimum fall below 20% to recognize existing contracts, infrastructure limits and existing reservation arrangements, and again through the regulator's demand calibration. Western Australia already runs a 15% rule, so the new obligation lands hardest on Gladstone. Watch the first annual calibration.
Projects that change the export total next
| Project | What it adds | Timing | Source |
|---|---|---|---|
| Scarborough and Pluto Train 2 | About 5 Mtpa through a new train plus up to 3 Mtpa through Pluto Train 1, for 8 Mtpa in all | Over 99% complete, with first LNG targeted for the fourth quarter of 2026 | Woodside |
| Barossa to Darwin LNG | New gas supply for the Darwin plant | First cargo left January 25, 2026 for Sakai, Japan | Santos |
| Gorgon: Jansz-Io compression | Holds up supply to Gorgon's three trains | 2027 | WA LNG Profile |
| Gorgon Stage 3 (Geryon, Eurytion) | New fields tied back to Barrow Island | 2028 | WA LNG Profile |
| Crux | Backfill gas for Prelude by a 160 km pipeline | 2027 | WA LNG Profile |
| North West Shelf extension | Approval to keep running to 2070 | Granted September 2025 | WA LNG Profile |
Most of this list is backfill: new gas to keep existing trains full as old fields decline. Only Pluto Train 2 adds liquefaction. Waitsia gas from the onshore Perth Basin also has an agreement to be processed through North West Shelf facilities, for up to 7 Mt of LNG in total.
Oil: under 80,000 barrels a day of crude
Australia is a small oil producer and a large importer. Geoscience Australia counts 27.6 million barrels of crude oil in 2024, down 11% on the year, plus 68 million barrels of condensate and 8 million barrels of LPG. Eighty-two percent of oil production comes from offshore fields on the North West Shelf, mostly off Western Australia, and much of it is condensate produced with the gas that feeds the LNG plants.
| Basin | Crude oil, 2024 (PJ) | Condensate, 2024 (PJ) |
|---|---|---|
| Northern Carnarvon and Roebuck | 112 | 204 |
| Bonaparte and Browse | 11 | 163 |
| Cooper and Eromanga | 31 | 8 |
| Gippsland | 6 | 10 |
| Australia total | 162 | 397 |
Source: Geoscience Australia, Australia's Energy Commodity Resources 2026. Totals include smaller basins not shown.
Barrels a day and reserve life, from the 2024 totals. 2024 was a leap year, so divide by 366.
- Crude: 27.6 million ÷ 366 = about 75,400 b/d.
- Condensate: 68 million ÷ 366 = about 185,800 b/d.
- LPG: 8 million ÷ 366 = about 21,900 b/d.
- All three: 104 million ÷ 366 = about 284,000 b/d.
- Crude reserve life: 213 million barrels of proved and probable (2P) reserves ÷ 27.6 million a year = 7.7 years, which matches Geoscience Australia's "less than 8 years". Condensate: 899 ÷ 68 = 13.2 years.
The EIA puts 2024 output higher, at 398,000 b/d including 194,000 b/d of condensate, because it uses a broader definition of liquids. Geoscience Australia notes its own total leaves out LPG produced on the North West Shelf. Either way, the gap with demand is wide. The EIA puts 2024 consumption at 1.15 million b/d, so crude alone covers about 6.6% of it. Our world production tables put Australia's output beside other producers.
Two refineries and imported fuel
Most of Australia's crude and condensate is sold abroad: over 94% of crude, condensate and LPG output in 2023-24, Geoscience Australia says. Exports of crude and condensate averaged 227,000 b/d in 2024 and South Korea was the largest buyer at 67,000 b/d, per the EIA. The same year Australia imported 154,000 b/d of crude for its own plants.
Only two refineries remain: Lytton in Queensland (109,000 b/d) and Geelong in Victoria (120,000 b/d), 229,000 b/d between them. They ran at 108% of nameplate capacity on average in 2024, the EIA says. That is far short of 1.15 million b/d of demand, so the rest arrives as finished fuel.
- Australia imported about 95% of its oil requirements in 2024, Geoscience Australia says.
- Imported products were 79% of refined product consumption, and imported crude was 60% of refinery inputs.
- Refined product imports were 1,923 PJ in 2023-24, up 5.3%.
- By volume, product imports in 2024 were 57% diesel and gasoil, 25% gasoline and 13% jet fuel. South Korea and Singapore were the largest suppliers, and imports from India rose almost 50% to 72,000 b/d (EIA).
Australia's LNG and oil, question by question
Is Australia the world's biggest LNG exporter?
No. It ranked third in 2024 with 19.6% of world LNG exports, behind Qatar and the United States, according to Geoscience Australia. The US was the largest exporter in 2025 at 109 Mt, the WA government says.
Why does the east coast worry about gas shortages when Australia exports so much?
Most east coast gas is already committed to export. The Gladstone plants used 75% of east coast gas consumption in 2025 (AEMO), the southern fields that supply Victoria and New South Wales are declining, and the western and eastern pipeline grids are not connected. That is why the government plans a reservation rule for exporters.
How much gas does Australia have left?
Proved and probable reserves were 99,124 PJ at the end of 2024, Geoscience Australia says. Divided by 2024 production of 6,353 PJ, that is about 15.6 years. Treat that as a ratio, not a forecast. Contingent resources not yet booked as reserves, 96,107 PJ of conventional gas alone, are larger than the conventional reserves.
Does Australia import natural gas?
It did not in 2024, Geoscience Australia says. That may change. AEMO's 2026 GSOO tests proposed LNG import terminals at Port Kembla in New South Wales and Outer Harbor in South Australia, and finds a terminal would push the forecast southern supply gaps out to 2034 if the pipelines and storage to move the gas are built too.
How much oil does Australia produce a day?
About 75,000 b/d of crude in 2024, or about 284,000 b/d once condensate and LPG are included, from Geoscience Australia's 2024 totals. Daily oil demand is about four times larger than all three combined.
References
- Geoscience Australia. Australia's Energy Commodity Resources 2026: Gas. https://www.ga.gov.au/aecr2026/gas
- Geoscience Australia. Australia's Energy Commodity Resources 2026: Oil. https://www.ga.gov.au/aecr2026/oil
- Geoscience Australia. Australia's Energy Commodity Resources 2026: Australia's energy production and trade. https://www.ga.gov.au/aecr2026/australias-energy-production-and-trade
- Government of Western Australia, Department of Energy and Economic Diversification. Western Australia LNG Profile, May 2026 (citing ABS International Trade in Goods and Services, GIIGNL, EnergyQuest and ABS Producer Price Indexes). https://www.wa.gov.au/system/files/2026-06/walngprofilemay2026.docx
- U.S. Energy Information Administration (EIA). Country Analysis Brief: Australia, December 4, 2025. https://www.eia.gov/international/analysis/country/AUS
- U.S. Energy Information Administration (EIA). "U.S. LNG exports rose 23% in the first half of 2026 because of higher capacity," Today in Energy, September 1, 2026. https://www.eia.gov/todayinenergy/detail.php?id=68064
- Australian Energy Market Operator (AEMO). 2026 Gas Statement of Opportunities, March 2026. https://www.aemo.com.au/-/media/files/gas/national_planning_and_forecasting/gsoo/2026/2026-gas-statement-of-opportunities.pdf
- Australian Energy Market Operator (AEMO). 2026 GSOO explainer. https://www.aemo.com.au/-/media/files/gas/national_planning_and_forecasting/gsoo/2026/2026-gsoo-explainer.pdf
- Clayton Utz. "Domestic Gas Reservation Scheme: exposure draft legislation released," September 14, 2026. https://www.claytonutz.com/insights/2026/september/domestic-gas-reservation-scheme-exposure-draft-legislation-released
- Woodside Energy. Submission to the Senate Economics Legislation Committee inquiry into the Domestic Gas Reservation Bill 2026, October 23, 2026. https://www.woodside.com/docs/default-source/sustainability-documents/transparency-documents/2026-government-submissions/woodside-submission---senate-inquiry-into-the-domestic-gas-reservation-bill-2026---october-2026---r.pdf
- Allens. "Gas market reforms taking shape," December 23, 2025. https://www.allens.com.au/insights-news/insights/2025/12/gas-market-reforms-taking-shape/
- Woodside Energy. Scarborough Energy Project. https://www.woodside.com/what-we-do/growth-projects/scarborough
- Santos. "Santos announces first Barossa LNG cargo." https://www.santos.com/news/santos-announces-first-barossa-lng-cargo/
- INPEX Australia. Ichthys LNG. https://www.inpex.com.au/projects-operations/ichthys-lng/
All sources checked November 23, 2026.