Denmark
North Sea Oil, the Tyra Restart and the 2050 End
Key Takeaways
- •Denmark produced 4.36 million cubic meters of oil in 2025, about 75,100 b/d, up from 58,800 b/d in 2023 as Tyra restarted (Danish Energy Agency).
- •Output peaked in 2004 at 22.6 million cubic meters, about 388,600 b/d, and fell every year from 2005 to 2023 (Danish Energy Agency field data, 1972 to 2025).
- •TotalEnergies restarted the rebuilt Tyra gas hub on March 22, 2024, after a shutdown that began in September 2019, with a plateau of 5.7 million cubic meters of gas a day (TotalEnergies).
- •Danish law bars any oil and gas license from running past December 31, 2050, and the eighth licensing round and all later rounds were canceled (Act No. 2389 of 2021, Ministry of Climate).
- •Baltic Pipe can carry up to 10 billion cubic meters of Norwegian gas a year across Denmark to Poland and has been fully operational since November 2022 (European Commission, CINEA).
The 2025 rebound in the agency's numbers
The Danish Energy Agency (DEA), which collects monthly reports from every operator in the Danish North Sea, puts 2025 oil output at 4.36 million cubic meters. That is about 75,100 barrels per day (b/d), up 28% from 58,800 b/d in 2023 and the second annual rise in a row (DEA yearly production file, 1972 to 2025, version of September 25, 2026, checked November 2026). Gas did more: gross output roughly doubled, from 1.29 billion normal cubic meters in 2023 to 2.70 billion in 2025.
The cause is one project. TotalEnergies shut the Tyra gas hub in September 2019 to rebuild it, and five fields went quiet with it: the DEA records no output from Tyra, Tyra Southeast, Harald, Valdemar or Roar from 2020 to 2023. The rebuilt hub restarted on March 22, 2024.
The recovery is from a low base. In 2004, the peak year, Danish fields produced 22.6 million cubic meters of oil, about 388,600 b/d, more than five times the 2025 figure. And the rebound has an end date written into law: no license can run past December 31, 2050. The DEA's preliminary monthly figures show 2026 running a little below 2025, at about 70,300 b/d for January to October.
Fifty-four years of Danish output
Every figure below comes from the DEA's yearly production file, which lists oil and gas output for each field from 1972. We converted cubic meters to barrels at 6.28981 barrels per cubic meter and divided by the days in each year.
| Year | Oil, million m³ | Oil, million barrels | Oil, b/d | Gross gas, billion Nm³ | What happened |
|---|---|---|---|---|---|
| 1972 | 0.11 | 0.7 | 1,800 | 0.02 | First oil, from the Dan field |
| 1981 | 0.88 | 5.5 | 15,100 | 0.16 | Gorm comes on stream |
| 1990 | 7.00 | 44.0 | 120,600 | 5.14 | Dan, Gorm, Skjold and Tyra all producing |
| 2000 | 21.13 | 132.9 | 363,200 | 11.32 | Halfdan, on stream since 1999, ramps up |
| 2004 | 22.61 | 142.2 | 388,600 | 10.93 | Oil peak |
| 2005 | 21.89 | 137.7 | 377,100 | 11.52 | Gas peak |
| 2010 | 14.22 | 89.5 | 245,100 | 8.06 | Dan and Halfdan both past their peaks |
| 2015 | 9.07 | 57.1 | 156,400 | 4.52 | |
| 2019 | 5.85 | 36.8 | 100,800 | 3.05 | Tyra shut in September |
| 2020 | 4.14 | 26.1 | 71,200 | 1.40 | First full year without Tyra |
| 2023 | 3.41 | 21.5 | 58,800 | 1.29 | Low point |
| 2024 | 3.66 | 23.0 | 62,900 | 1.52 | Tyra restarts in March |
| 2025 | 4.36 | 27.4 | 75,100 | 2.70 | First full year of the rebuilt hub |
| 2026, Jan to Oct | 3.40 | 21.4 | 70,300 | 2.61 | Preliminary monthly data |
Source: DEA yearly production file (1972 to 2025) and DEA monthly production report for October 2026, both checked November 23, 2026. "Oil" is the DEA's oil series for all fields. Gross gas includes gas later burned as platform fuel, flared or reinjected.
From 1972 to 2025 the Danish North Sea gave up 466 million cubic meters of oil, about 2.93 billion barrels, and 261 billion normal cubic meters of gross gas. The fall after 2004 was steady: output dropped in every year from 2005 to 2023, and the 2023 total was 85% below the peak. For scale against other producers, see our world oil production tracker.
A note on units. The DEA reports in cubic meters. To turn an annual figure into barrels per day, multiply the cubic meters by 6.28981 and divide by the days in the year. For 2025: 4,360,600 m³ times 6.28981 is 27.43 million barrels, and 27.43 million divided by 365 is about 75,100 b/d.
Which fields produce the oil and gas
Sixteen fields reported production in the first ten months of 2026, and 15 of them were still producing in October (Rolf produced earlier in the year). The DEA lists TotalEnergies as operator of most Danish fields, with INEOS running a smaller group. Its monthly report breaks the totals down by field.
| Field | Oil, thousand m³ | Share of oil | Gas, million Nm³ | Share of gas |
|---|---|---|---|---|
| Halfdan | 718.8 | 21.2% | 479.7 | 18.4% |
| Dan | 622.0 | 18.3% | 174.2 | 6.7% |
| Valdemar | 374.1 | 11.0% | 145.8 | 5.6% |
| Tyra | 364.4 | 10.7% | 398.8 | 15.3% |
| Skjold | 293.7 | 8.6% | 58.9 | 2.3% |
| Harald | 200.7 | 5.9% | 718.9 | 27.6% |
| Tyra Southeast | 178.0 | 5.2% | 351.7 | 13.5% |
| Gorm | 160.6 | 4.7% | 45.4 | 1.7% |
| Syd Arne | 157.2 | 4.6% | 44.1 | 1.7% |
| Solsort | 100.9 | 3.0% | 18.4 | 0.7% |
| Roar | 50.7 | 1.5% | 129.7 | 5.0% |
| Five smaller fields | 175.4 | 5.2% | 42.7 | 1.6% |
| Total | 3,396.6 | 2,608.3 |
Source: DEA, "Danish Production of Oil, Gas and Water for October 2026" (SI units), year-to-date columns, checked November 23, 2026. The five smaller fields are Siri, Nini, Kraka, Cecilie and Rolf.
Oil is spread across older fields, with Halfdan and Dan alone giving nearly 40%. Gas is concentrated in the Tyra hub, and Harald is now the single largest gas field. The DEA's 2025 resource report explains why: the HEMJ-1X exploration well found gas, and it was put into production through the Harald platform. That one well largely explains why the agency raised its gas forecast for 2025 to 2029 by 1.92 billion Nm³, or 13.4%, against the previous year's forecast for the same years.
Tyra: shut in 2019, back in March 2024
Tyra lies 225 km west of Esbjerg and was discovered in 1968, according to TotalEnergies. Production stopped in September 2019 so the old installations could be removed and replaced, and the operator says 98.5% of the material from the retired platforms was reused or recycled.
TotalEnergies announced the restart on March 22, 2024, and the Danish climate ministry's 2026 climate projection records the same commissioning date. The operator gave these figures for the rebuilt hub:
- Plateau of 5.7 million cubic meters of gas and 22,000 barrels of condensate a day.
- Gas leaves through two export pipelines, one to Nybro in Denmark and one to Den Helder in the Netherlands.
- Greenhouse gas emissions 30% lower than the old facilities.
- Partners in the Danish Underground Consortium: TotalEnergies 43.2% (operator), BlueNord 36.8% and Nordsøfonden, the Danish state's oil and gas fund, 20%.
At plateau, 5.7 million cubic meters a day comes to about 2.1 billion cubic meters a year, close to the 2.25 billion Nm³ of sales gas the whole Danish sector delivered in 2025.
The DEA's field data show what the shutdown cost and what the restart brought back. Five fields went to zero from 2020 to 2023 and resumed in 2024:
| Fields tied to the Tyra shutdown | 2018 | 2019 (shut in September) | 2020 to 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Oil, thousand m³ (Tyra, Tyra Southeast, Harald, Valdemar, Roar) | 1,335.9 | 867.3 | 0 | 33.5 | 1,013.4 |
| Gross gas, million Nm³ (same five fields) | 2,176.8 | 1,408.5 | 0 | 141.8 | 1,488.0 |
| Share of national oil | 20.2% | 14.8% | 0% | 0.9% | 23.2% |
| Share of national gross gas | 54.0% | 46.3% | 0% | 9.3% | 55.0% |
Source: DEA yearly production file, field rows, checked November 23, 2026.
So 2024 was mostly a restart year, with the hub producing for part of it and at low rates. In 2025 the five fields beat their cut-short 2019 but were still below 2018, the last full year before the shutdown: about 76% of the 2018 oil and 68% of the gas. Their share of the national total is back where it was, because the rest of the Danish sector shrank in the meantime. In the first ten months of 2026 they gave 34% of Danish oil and 67% of the gas. Norway's sector next door grew in a different way, through a new giant field rather than a rebuild, as our Norway profile shows with Johan Sverdrup.
Six barrels of water for every barrel of oil
Danish wells bring up far more water than oil. The DEA reports water production alongside oil, and the 2025 totals were 27.47 million cubic meters of water against 4.36 million of oil.
Here is the arithmetic. Water divided by oil is 27.47 divided by 4.36, or 6.3 cubic meters of water for each cubic meter of oil. The water cut, water as a share of all liquid lifted, is 27.47 divided by (27.47 plus 4.36), which is 86%. Of every 100 barrels of liquid that reached the platforms in 2025, about 86 were water that had to be separated out and handled.
The oldest fields lift the most. Dan alone lifted 7.7 million cubic meters of water in January to October 2026 to produce 0.62 million of oil, a ratio above 12 to 1.
The agency's forecast against what came out of the ground
The DEA publishes an annual resource assessment with a production forecast. The latest edition we found is dated September 4, 2025, and the Danish climate ministry's 2026 projection still cites it. Its five-year outlook:
| Year | Forecast oil, million m³ | Forecast oil, b/d | Actual oil, b/d | Forecast sales gas, billion Nm³ |
|---|---|---|---|---|
| 2025 | 5.01 | 86,300 | 75,100 | 3.04 |
| 2026 | 5.14 | 88,600 | 70,300 (Jan to Oct, preliminary) | 3.13 |
| 2027 | 4.30 | 74,100 | 3.09 | |
| 2028 | 5.57 | 95,700 | 3.64 | |
| 2029 | 5.33 | 91,800 | 3.38 |
Source: DEA, "Ressourceopgørelse og prognose 2025," table 5, and DEA production data, checked November 23, 2026. Barrels per day are our conversion.
Oil output in 2025 came in 13% below the forecast. On gas the gap was wider. The DEA's forecast is for sales gas, which is gross production minus platform fuel, flaring and reinjection. Taking those out of the 2025 gross figure leaves about 2.25 billion Nm³ of sales gas, 26% below the 3.04 billion forecast (the DEA notes that its 2025 fuel and flare values are not yet final). Through October, 2026 oil and gas are both running below the forecast rates for the year.
The longer view in the same report:
- Oil output is expected to peak in 2030 at 6.4 million cubic meters, about 110,300 b/d, and then decline.
- Sales gas is expected to peak in 2028 at about 3.6 billion Nm³ and hold near that level to 2031.
- Expected total oil production from 2025 to 2050 is 72.6 million cubic meters, about 457 million barrels. Expected sales gas is 43.3 billion Nm³.
- Denmark is expected to be a net exporter of oil from 2028 through 2035, and a net exporter of gas through 2047.
The climate ministry's 2026 projection, which follows this forecast, has total production falling sharply toward 2043 and ending before 2050. The 2050 law sets the outer limit. Field economics are expected to close most of the production earlier.
How the 2050 end date became law
On December 3, 2020, a broad majority in the Danish parliament agreed to cancel the eighth licensing round, then under way, and all future rounds, and to end all oil and gas extraction in the North Sea by 2050. The ministry's release said that "the oil and gas valves will be turned off for good" in 2050 and tied the date to the goal of climate neutrality in the Danish Climate Act.
The agreement became Act No. 2389 of December 14, 2021, which amended the Danish Subsoil Act. In the consolidated text in force today (Consolidated Act No. 1461 of November 29, 2023), section 13(6) says licenses to explore for and produce hydrocarbons cannot be granted or extended beyond December 31, 2050. Section 13(7) lets the minister agree with a license holder to give up a license that would otherwise have had a right to extension past that date.
What the law changes in the numbers:
- Producing fields keep their licenses, which can still be extended up to, but not past, the end of 2050. The DEA's 2025 assessment counts only volumes that can be produced before each license expires, and section 13(7) provides for a negotiated surrender rather than revocation.
- The end date already affects the numbers. The DEA writes down its estimate of "technological resources" (extra oil and gas new technology might recover) by 15% each year, because the 2050 cutoff reduces the incentive to invest in that technology.
The ministry's 2020 release also put the North Sea in money terms: about DKK 541 billion in state revenue since 1972, DKK 5.9 billion of it in 2019, and around 4,000 people employed directly or indirectly in extraction in 2016. At the time it described Denmark as the EU's largest oil producer.
How many years of production the reserves cover
The DEA counted 53.1 million cubic meters of oil reserves on January 1, 2025, in fields that are producing, approved or likely to be developed. Its expected production path to 2050, which adds risk-weighted volumes from projects not yet approved, totals 72.6 million cubic meters.
Divide reserves by 2025 output: 53.1 divided by 4.36 is about 12 years at the 2025 rate. Using the expected path instead, 72.6 divided by 4.36 gives about 17 years. Neither is a forecast of when the last barrel comes out, because output will not stay flat. The DEA expects it to rise to 2030 and then fall. The ratio does show something plain: at today's pace, Denmark's booked oil reserves run out in the late 2030s, more than a decade before the legal end date.
Gas reserves on the same date were 34.5 billion Nm³ of sales gas, or about 15 years at the 2025 sales-gas rate of 2.25 billion Nm³.
Baltic Pipe: Norwegian gas across Denmark to Poland
Baltic Pipe was built to carry Norwegian gas, not Danish gas. It links the Norwegian pipeline system in the North Sea to Poland by crossing Denmark, and it was built by Energinet, the Danish gas and electricity transmission operator, and GAZ-SYSTEM, its Polish counterpart. According to the European Commission's Climate, Infrastructure and Environment Executive Agency (CINEA), which managed EU funding for it:
- Capacity is up to 10 billion cubic meters a year from Norway to Poland and 3 billion a year from Poland to Denmark.
- The whole project is about 900 km long, including a 275 km offshore pipeline between Denmark and Poland in the Baltic Sea.
- It received €267 million from the Connecting Europe Facility and was fully operational in November 2022.
Energinet put the final cost at approximately DKK 10 billion in December 2023 and said Russia's war in Ukraine had put pressure on the project.
Baltic Pipe's northbound capacity is about 3.7 times the gross gas Denmark produced in 2025 (10 billion against 2.70 billion cubic meters, measured on slightly different bases). That is the main point for readers tracking Danish gas: the country is a transit route for far more gas than it produces. Price effects show up in European hub prices, which we compare in Henry Hub vs TTF vs JKM and track on our natural gas price page.
Gross gas, sales gas and preliminary months
Three things to check before quoting a Danish number:
- Gross or sales gas. The DEA's production tables show gross gas. Its forecasts use sales gas. In 2025 the difference was about 457 million Nm³, the gas used as platform fuel, flared or reinjected. A forecast compared with gross output will look better met than it was.
- Preliminary months. The DEA labels its monthly figures preliminary. The 2026 numbers on this page will be revised when the 2026 yearly file comes out. The 2025 file was last updated on September 25, 2026.
- Cubic meters, barrels and oil equivalent. Company reports for the Tyra partners use barrels of oil equivalent, which mix oil and gas. Our barrel of oil equivalent explainer shows how those totals are built, and why they cannot be compared directly with the DEA's oil-only series.
We could not open the U.S. Energy Information Administration's Denmark country page or its data service on November 23, 2026, so no EIA figure appears here. The DEA's own field data are the primary record in any case. For price context, see our Brent price page, which tracks the North Sea crude benchmark.
Danish output and the 2050 law: what people ask
How much oil does Denmark produce?
About 75,100 barrels per day in 2025, or 4.36 million cubic meters for the year, according to the Danish Energy Agency. Preliminary data for January to October 2026 average about 70,300 b/d. That compares with a 2004 peak of about 388,600 b/d.
When did the Tyra field restart?
March 22, 2024. TotalEnergies, the operator, announced the restart that day after a redevelopment that began when production stopped in September 2019. The hub's planned plateau is 5.7 million cubic meters of gas and 22,000 barrels of condensate a day.
Is Denmark really ending oil and gas production by 2050?
Yes, by law. Section 13(6) of the Danish Subsoil Act, added by Act No. 2389 of December 2021, bars any hydrocarbon license from being granted or extended past December 31, 2050. The DEA's forecast has production winding down well before that, as fields become uneconomic.
Does Denmark still hold oil and gas licensing rounds?
No. The eighth licensing round was canceled under the December 3, 2020 North Sea agreement, along with every future round. The ministry said two narrower licensing routes remain, both bound by the 2050 end date, but the state no longer invites bids in open rounds.
Is Denmark a net oil exporter?
Not yet for oil. The DEA's September 2025 forecast expects Denmark to become a net exporter of oil from 2028 and to stay one through 2035. For gas, the agency expected Denmark to turn net exporter once Tyra was fully back during 2025 and to remain one through 2047.
Does Baltic Pipe carry Danish gas?
Mostly no. It was built to move up to 10 billion cubic meters a year of Norwegian gas across Denmark to Poland, with 3 billion a year of capacity in the opposite direction. Danish North Sea gas leaves through three export points in the DEA's data: Tyra East, with lines to Nybro and Den Helder, handled 51% of 2025 exports, F3 42% and Syd Arne 6%.
For the bigger North Sea picture, the United Kingdom profile covers the neighboring sector's decline and tax regime, and the Netherlands profile, where Tyra's second export line lands, covers the closure of Groningen and Dutch gas imports.
References
- Danish Energy Agency (Energistyrelsen). Yearly production, injection, flare, fuel and export in SI units, 1972 to 2025 (version of September 25, 2026). https://ens.dk/media/7167/download
- Danish Energy Agency. Danish Production of Oil, Gas and Water for October 2026 (SI units and oil field units). https://ens.dk/media/8903/download and https://ens.dk/media/8904/download
- Danish Energy Agency. Monthly and yearly production. https://ens.dk/en/energy-sources/monthly-and-yearly-production
- Danish Energy Agency. About oil and gas (field operators). https://ens.dk/en/energy-sources/about-oil-and-gas
- Danish Energy Agency. "Ressourceopgørelse og prognose 2025," version of September 4, 2025. https://ens.dk/media/7291/download
- TotalEnergies. "Denmark: TotalEnergies restarts gas production at the Tyra offshore hub after a major redevelopment." March 22, 2024. https://totalenergies.com/news/press-releases/denmark-totalenergies-restarts-gas-production-tyra-offshore-hub-after-major
- Danish Ministry of Climate, Energy and Utilities. "Denmark introduces cutoff date of 2050 for oil and gas extraction in the North Sea, cancels all future licensing rounds." December 3, 2020. https://en.kefm.dk/news/news-archive/2020/dec/denmark-introduces-cutoff-date-of-2050-for-oil-and-gas-extraction-in-the-north-sea-cancels-all-future-licensing-rounds
- Retsinformation (Danish official legal database). Consolidated Act No. 1461 of November 29, 2023 on the use of the Danish subsoil, section 13, and note on Act No. 2389 of December 14, 2021. https://www.retsinformation.dk/api/pdf/239902
- Danish Ministry of Climate, Energy and Utilities. Klimastatus og fremskrivning 2026, chapter 26, "Produktion af olie, gas og VE-brændsler." https://admin.kefm.dk/Media/639189372109776082/KF26%20Kapitel%2026%20Produktion%20af%20olie,%20gas%20og%20VE-br%C3%A6ndsler.pdf
- European Commission, CINEA. "Baltic Pipe: subsea pipeline to transport natural gas." https://cinea.ec.europa.eu/featured-projects/baltic-pipe-subsea-pipeline-transport-natural-gas-under-north-sea_en
- Energinet. "Russia's war in Ukraine put pressure on Baltic Pipe, which ends up costing approx. DKK 10 billion." December 12, 2023. https://en.energinet.dk/about-our-news/news/2023/12/12/the-war-in-ukraine-put-pressure-on-baltic-pipe-which-ends-up-costing-approx-dkk-10-billion/
All sources checked November 23, 2026.