Key Takeaways

  • •Vietnam produced 164,700 b/d of crude and condensate in 2025, up from 162,800 b/d in 2024 but half the 2015 rate of 333,400 b/d (EIA).
  • •Customs counted 14.15 million tonnes of crude imports in 2025, worth $7.74 billion, against 2.48 million tonnes of exports (preliminary data).
  • •Petrovietnam estimated its own 2025 oil output at 9.98 million tonnes, a group figure that includes fields abroad, against a plan of 8.29 million tonnes.
  • •Nghi Son, a 200,000 b/d refinery designed for Kuwaiti crude, ran at 125% of design capacity from July 2026, while Dung Quat imports 30% to 35% of its feed (OGJ, Hydrocarbon Processing, BSR).
  • •The Block B gas project is set to deliver 5.06 billion cubic meters a year at plateau, with first gas due no later than the third quarter of 2027 (Ministry of Industry and Trade).

Vietnam burns about four barrels of oil for every barrel of crude it pumps. The U.S. Energy Information Administration (EIA) puts 2025 crude and condensate output at 164,700 barrels per day (b/d), against consumption of 653,800 b/d of petroleum and other liquids (EIA International Energy Statistics, checked November 2026). Output rose slightly from 162,800 b/d in 2024, the first increase in the series since 2015, but it is still less than half the 2015 rate of 333,400 b/d. The gap is filled by imports: Vietnam's customs office counted 14.15 million tonnes of crude oil coming in during 2025 and only 2.48 million tonnes going out.

By our arithmetic further down, two refineries account for almost all of that imported crude. Nghi Son, in Thanh Hoa province, was designed for Kuwaiti crude. Dung Quat, in Quang Ngai, was built around crude from Vietnam's own Bach Ho field and now buys about a third of its feed abroad. Both were running above their design rates in late 2025 and early 2026, so a disruption to either refinery's supply shows up quickly in the country's fuel market.

Two counts of the same oil: EIA barrels and Petrovietnam tonnes

The number most often quoted in Vietnam for "oil production" is Petrovietnam's (PVN) annual figure, and it is larger than the national total. At its year-end review on December 26, 2025, PVN estimated its 2025 oil output at 9.98 million tonnes, 1.69 million tonnes (about 20.4%) above the plan of 8.29 million tonnes, and said it reached the full-year plan one month and 28 days early. The 2024 figure on the same basis was 9.89 million tonnes, so PVN's output rose about 0.9%.

That is a group figure. PVN's subsidiaries also produce abroad, and the Ministry of Industry and Trade (MOIT) sets them separate targets for 2026 to 2030: 7.0 to 9.2 million tonnes a year of domestic oil, and 1.4 to 1.8 million tonnes a year of oil from overseas assets (MOIT, November 10, 2026).

We converted both figures to barrels a day to see how far apart they are. The inputs:

Input Value Source
PVN group oil output, 2025 9.98 million tonnes (estimate) PVN, December 26, 2025
National crude and condensate, 2025 164,700 b/d EIA International Energy Statistics
Conversion factor 7.33 barrels per tonne (assumed) PetroEyes assumption
Days in 2025 365

PVN's 9.98 million tonnes times 7.33 is about 73.2 million barrels. Divided by 365, that is roughly 200,400 b/d. Going the other way, EIA's 164,700 b/d times 365 is 60.1 million barrels, and 60.1 million divided by 7.33 is about 8.2 million tonnes. The difference is roughly 1.8 million tonnes. That is about the size MOIT plans for PVN's overseas oil in 2026 to 2030, though PVN did not publish its 2025 split between domestic and overseas output.

The conversion factor is the weak point. Light crude yields more barrels per tonne than the factor we use and heavy crude yields fewer, so treat the daily rates on this page as approximate to within a few percent. Our page on API gravity and sulfur explains why density changes the barrel count.

The 2026 figure MOIT published is domestic only: 6.66 million tonnes of oil in the first nine months of 2026, 85% of the government's full-year plan, and 4.82 billion cubic meters of gas landed onshore. At 7.33 barrels a tonne over 273 days, that works out to about 178,800 b/d, roughly 9% above EIA's 2025 average. EIA has not yet published a 2026 annual figure, so this is a PetroEyes estimate from the ministry's tonnage.

Output by year, 2014 to 2025

EIA's annual series shows the shape of the decline. Crude and condensate output peaked in this window in 2015 and fell every year to 2024. Total liquids include natural gas liquids and refinery processing gain, which is why they run higher than crude.

Year Crude and lease condensate (b/d) Total petroleum and other liquids (b/d) Dry natural gas output (billion m³)
2014 306,800 318,900 9.70
2015 333,400 369,400 10.13
2016 301,800 336,600 10.08
2017 272,300 288,200 9.31
2018 240,800 257,200 9.51
2019 221,800 240,200 9.72
2020 193,300 214,500 8.54
2021 184,200 206,000 6.98
2022 179,300 201,000 7.68
2023 173,400 197,400 7.48
2024 162,800 197,200 6.00
2025 164,700 199,100 5.68

Source: EIA International Energy Statistics, bulk file updated November 19, 2026 (crude series last revised March 27, 2026). Figures rounded to the nearest hundred b/d.

From 2015 to 2024, crude output fell by more than half, an average loss of about 19,000 b/d a year. The 2025 uptick of 1,900 b/d is small, but it broke a nine-year run. Consumption moved the other way: 412,000 b/d in 2015 and 653,800 b/d in 2025, according to the same EIA file. For context on where Vietnam sits among producers, see our world oil production table. Our Malaysia profile shows a neighbor whose oil output peaked in 2004 and whose larger export is now gas.

EIA's written country analysis for Vietnam has not been updated since February 2017. It gave proved crude reserves of 4.4 billion barrels as of 2016, citing the Oil and Gas Journal, and a liquids peak of 403,000 b/d in 2004. Both numbers are from that 2017 page, and EIA's current data file carries no Vietnam crude reserves series.

New fields that slowed the decline

MOIT lists three projects that started producing in 2025: Dai Hung phase 3 in Block 05-1a, Kinh Ngu Trang and Kinh Ngu Trang Nam in Block 09-2/09, and BK-24 in Block 09-1. Over 2021 to 2025, PVN's exploration and production business drilled 46 exploration and appraisal wells, made eight discoveries and produced a combined 51.98 million tonnes of oil and 35.21 billion cubic meters of gas landed onshore, the ministry said.

One of those discoveries is Hai Su Vang, in Blocks 15-2/17 and 15-1/05 of the Cuu Long basin, which MOIT describes as holding an estimated several hundred million barrels. The ministry expects it to help slow the fall in output.

The schedule ahead is busy. For 2026, MOIT names BK-26 and RC-12 in Block 09-1, Thien Nga and Hai Au in Block 12/11, and Lac Da Vang A in Block 15-1/05. It expects 2027 to be the peak year, with seven new fields or facilities, among them Block B. PVN's target is to bring 20 fields or facilities into production over 2026 to 2030. A new Petroleum Law, passed on August 23, 2026, takes effect on March 1, 2027, and gives PVN more authority over its own projects (MOIT, November 10, 2026).

The fiscal side shows how much oil revenue has shrunk. Vietnam's statistics office reported state budget revenue from crude oil of nearly 48.0 trillion dong in 2025, 90.1% of the budget estimate and 18.2% lower than in 2024 (National Statistics Office, January 2026). The office's annual release reports this revenue but not crude tonnage.

Crude trade in 2025: 14.2 million tonnes in, 2.5 million out

The General Department of Customs publishes preliminary monthly tables of main imports and exports, with tonnes and US dollar values. The year-to-date columns in the December 2025 tables give the full-year totals. We added the price per tonne and an approximate daily rate.

Flow Tonnes Value Change from 2024 (volume, value) Average per tonne Approx. b/d at 7.33 bbl/t
Crude imports, 2025 14,153,013 $7.74 billion up 5.3%, down 4.6% $547 284,200
Crude exports, 2025 2,482,382 $1.39 billion down 4.5%, down 19.3% $562 49,800
Crude imports, January to July 2026 7,139,788 $5.37 billion down 12.0%, up 18.0% $752 246,900

Sources: General Department of Customs, Statistics of main imports by month (Table 15B/TCHQ, December 2025 and July 2026) and Statistics of main exports by month (Table 14B/TCHQ, December 2025), preliminary. Per-tonne values and daily rates are PetroEyes calculations.

Net imports in 2025 were about 11.7 million tonnes, or roughly 234,000 b/d. At 7.33 barrels a tonne, the average import cost about $75 a barrel, against about $77 for the crude Vietnam sold abroad. Customs does not split the totals by grade, so the price gap is an average across very different crudes.

Kuwait dominates the import side. Kuwait supplied 80% of Vietnam's crude imports in 2025, Hydrocarbon Processing reported in October 2026, without naming its data source. Nghi Son, built to run on Kuwaiti crude, accounts for most of that share, and it is why 2026 was a difficult year. Our Kuwait profile covers the supplier's side.

Nghi Son: built for Kuwaiti crude

The Nghi Son refinery has a 200,000 b/d crude distillation unit inside a $9 billion refinery and petrochemical complex in Thanh Hoa province. It was designed to process Kuwaiti crude and started commercial operation on November 14, 2018, according to shareholder Idemitsu Kosan, as reported by the Oil and Gas Journal in December 2018. The owners at that time were Idemitsu Kosan (35.1%), Kuwait Petroleum Europe (35.1%), PVN (25.1%) and Mitsui Chemicals (4.7%).

The refinery now runs well above its design rate. In January 2026 it was running at about 120% of its 200,000 b/d design capacity and planned to import almost 12.5 million tonnes of crude in 2026, producing about 9 million tonnes of fuel for the domestic market, Vietnam News reported. It processed its first non-Kuwaiti cargo, about one million barrels of Das Blend, between December 23, 2025 and January 12, 2026. Kuwaiti grades remain its core feed under long-term supply agreements, and the refinery planned 10 to 12 million barrels a year of other crudes to cover maintenance on its residue desulfurization unit.

That plan became necessary sooner than expected. Nghi Son had supply disruptions in March and April 2026 because of the Iran war, and Vietnam received no Kuwaiti crude from April through July, Hydrocarbon Processing reported on October 2, 2026. Kuwaiti shipments in the first eight months of 2026 totaled 2.8 million tonnes, down 64% from a year earlier. Vietnam bought more from Oman, the UAE, the US, Iraq, Angola and the Republic of Congo, and the refinery can now process 10 crude types. It stopped buying WTI because the grade was too light. By October, 75% of newly arranged cargoes were again from Kuwait, and the refinery had been running at 125% of design capacity since July. Our Strait of Hormuz page follows the 2026 disruption to Gulf shipping, and our guide to Dubai, Oman and Murban explains the benchmarks used to price Gulf grades like the Omani and UAE crude Vietnam bought instead.

Dung Quat: Bach Ho crude and a growing import share

Dung Quat, run by Binh Son Refining and Petrochemical (BSR), a PVN subsidiary, was designed to run on 100% Bach Ho crude or a blend of 85% Bach Ho and 15% Dubai crude, PVN's PetroTimes reported in July 2025. Its design capacity is 6.5 million tonnes of crude a year (Vietnam News, March 31, 2026). At 7.33 barrels a tonne, that is about 130,500 b/d, which matches the 130,000 b/d EIA gave in 2017.

PVN now quotes the refinery's capacity as 148,000 b/d, and says the upgrade and expansion project will lift it to 171,000 b/d. The engineering, procurement and construction contract went to a Chengda and BPE consortium, with an investment of about 36,397 billion dong ($1.489 billion), a 37-month build and operation expected in 2028. The upgraded plant will make Euro V fuels (PVN, July 15, 2026). The 148,000 figure is close to what the plant already does at high run rates: PetroTimes reported it operating at 118% of design capacity in July 2025, and PVN said the plant ran at up to 122% of capacity in the second half of 2025.

Less of the feed is Vietnamese now. About 30% to 35% of Dung Quat's crude now comes from abroad, from West Africa, the Mediterranean, the US and the Middle East, BSR told Vietnam News in March 2026. The refinery supplies about 30% to 35% of Vietnam's total fuel demand. PVN put BSR's 2025 production at 7.9 million tonnes of products, 108% of plan, in a December 23, 2025 release written before the year closed.

A rough check, using the 2026 run rates because those are the ones published: Nghi Son at 120% to 125% of 200,000 b/d is 240,000 to 250,000 b/d of imported crude. Dung Quat at 148,000 b/d with 30% to 35% imported adds about 44,000 to 52,000 b/d. Together that is in the range of the 284,000 b/d of 2025 imports in the customs table, which leaves little room for any other buyer.

What 2026 did to the import bill

The customs table above shows the cost. In the first seven months of 2026, Vietnam imported 12.0% less crude by volume than a year earlier, but paid 18.0% more. The average cost per tonne rose from $547 in 2025 to $752, or from about $75 to about $103 a barrel at our conversion factor. Our Brent price page shows the price move behind it.

The statistics office's third-quarter release puts the net bill in a wider frame. In the first nine months of 2026, Vietnam ran a trade deficit of $5.97 billion on crude oil and $8.26 billion on petroleum products, and the overall goods balance swung to a deficit of $19.42 billion from a surplus of $16.87 billion a year earlier (National Statistics Office, October 2026).

Gas: falling output, Block B and the Thi Vai terminal

Gas output has fallen faster than oil. EIA's dry gas series dropped from 10.13 billion cubic meters in 2015 to 5.68 billion in 2025. Vietnam started importing gas in 2023, and EIA counts 0.62 billion cubic meters of imports in 2025.

The Thi Vai LNG terminal, run by PV GAS and inaugurated in 2023, can handle one million tonnes a year. In April 2026 PV GAS completed a trial that raised the regasification rate from the original design of 171 tonnes an hour to 288 tonnes an hour, or 9.5 million standard cubic meters a day, to supply power plants in the dry season (PVN, April 9, 2026). The terminal can berth ships of up to 100,000 deadweight tonnes.

At about 1.36 billion cubic meters of gas per million tonnes of LNG, EIA's 0.62 billion cubic meters for 2025 equals roughly 0.46 million tonnes, less than half of Thi Vai's capacity alone. That is a PetroEyes conversion. For how LNG delivered to Asia is priced, see our Henry Hub, TTF and JKM comparison.

The project meant to reverse the domestic gas decline is the Block B chain, which will feed power plants in the Mekong Delta region of the southwest. MOIT describes it in three parts:

  • Upstream: Blocks B, 48/95 and 52/97, operated by PVN with PVEP, MOECO and PTTEP, with an approved investment of $6.61 billion (Decision 46/QĐ-TTg, July 19, 2018). Expected recoverable reserves are 112 billion cubic meters of raw gas, and plateau supply is 5.06 billion cubic meters a year.
  • Pipeline: the Block B to O Mon pipeline, about $1.277 billion (Decision 1167/QĐ-TTg, October 10, 2023).
  • Power plants at O Mon: O Mon I (660 MW), O Mon II (1,050 MW), O Mon III (1,150 MW) and O Mon IV (1,050 MW).

First gas is due no later than the third quarter of 2027, under the national power plan as amended in April 2025. At plateau, 5.06 billion cubic meters a year is close to the 5.68 billion cubic meters of dry gas the whole country produced in 2025. Further out, MOIT puts the Ca Voi Xanh (Blue Whale) project, which is to supply power plants in central Vietnam, at 248 billion cubic meters of recoverable raw gas, about 7 billion cubic meters a year at plateau, with first gas expected in the fourth quarter of 2030.

Vietnam crude and refinery FAQ

How much oil does Vietnam produce a day?

About 164,700 b/d of crude and condensate in 2025, according to EIA, or 199,100 b/d counting all liquids. MOIT's domestic figure for the first nine months of 2026, 6.66 million tonnes, converts to roughly 178,800 b/d, so 2026 is running higher.

Is Vietnam a net oil importer?

Yes, for both crude and fuel. Customs recorded 14.15 million tonnes of crude imports and 2.48 million tonnes of crude exports in 2025. Fuel adds to the gap: 9.96 million tonnes of petroleum products came in during 2025 and 1.38 million tonnes went out, on the same customs tables.

How much oil did Petrovietnam produce in 2025?

Its year-end estimate was 9.98 million tonnes, up about 0.9% from 9.89 million tonnes in 2024. The figure covers PVN's fields abroad as well as in Vietnam, so it is larger than national output. For 2026 to 2030, PVN's targets are 7.0 to 9.2 million tonnes a year at home plus 1.4 to 1.8 million tonnes abroad.

Where does Vietnam get its imported crude?

Mostly Kuwait. Hydrocarbon Processing put Kuwait's share at 80% of 2025 imports. After the 2026 disruption, cargoes also came from Oman, the UAE, the US, Iraq, Angola and the Republic of Congo.

Why does the Nghi Son refinery use Kuwaiti crude?

It was designed for it. Kuwait Petroleum Europe held 35.1% of the plant at startup, and long-term supply agreements keep Kuwaiti grades as the core feed. Other grades, starting with a Das Blend cargo in December 2025, cover maintenance periods and supply gaps.

When will the Block B gas project start?

The government target is first gas no later than the third quarter of 2027, according to MOIT's November 2026 review. At plateau it would supply 5.06 billion cubic meters a year to the O Mon power plants.

References

  1. U.S. Energy Information Administration, International Energy Statistics, bulk data file INTL.zip (updated November 19, 2026). https://www.eia.gov/opendata/bulk/INTL.zip
  2. U.S. Energy Information Administration, Country Analysis: Vietnam (last updated February 2017). https://www.eia.gov/international/analysis/country/VNM
  3. Ministry of Industry and Trade of Vietnam, Gia tăng nguồn cung dầu khí, củng cố nền tảng an ninh năng lượng (November 10, 2026). https://moit.gov.vn/tin-tuc/gia-tang-nguon-cung-dau-khi-cung-co-nen-tang-an-ninh-nang-luong.html
  4. Petrovietnam (PetroTimes), Petrovietnam quyết tâm bứt phá trong năm 2026, đóng góp vào mục tiêu tăng trưởng "2 con số" (December 26, 2025). https://petrovietnam.petrotimes.vn/petrovietnam-quyet-tam-but-pha-dong-gop-vao-muc-tieu-tang-truong-2-con-so-736209.html
  5. General Department of Customs, Statistics of main imports by month, December 2025, preliminary (Table 15B/TCHQ). https://asemconnectvietnam.gov.vn/WebLocalfiles/NGA/Thang1Nam2026/19120261025222025_t12_2n_ta_sb_.pdf
  6. General Department of Customs, Statistics of main exports by month, December 2025, preliminary (Table 14B/TCHQ). https://asemconnectvietnam.gov.vn/WebLocalfiles/NGA/Thang1Nam2026/19120261023492025_t12_2x_ta_sb_.pdf
  7. General Department of Customs, Statistics of main imports by month, July 2026, preliminary. https://asemconnectvietnam.gov.vn/WebLocalfiles/NGA/Thang8Nam2026/782026103782026_t7_2n_ta_sb_.pdf
  8. National Statistics Office of Vietnam, Thông cáo báo chí tình hình kinh tế xã hội quý IV và năm 2025 (January 2026). https://www.nso.gov.vn/du-lieu-va-so-lieu-thong-ke/2026/01/thong-cao-bao-chi-tinh-hinh-kinh-te-xa-hoi-quy-iv-va-nam-2025/
  9. National Statistics Office of Vietnam, Thông cáo báo chí tình hình kinh tế xã hội quý III và 9 tháng năm 2026 (October 2026). https://www.nso.gov.vn/du-lieu-va-so-lieu-thong-ke/2026/10/thong-cao-bao-chi-tinh-hinh-kinh-te-xa-hoi-quy-iii-va-9-thang-nam-2026/
  10. Petrovietnam, The Dung Quat Refinery upgrade project enters a new phase of development (July 15, 2026). https://petrovietnam.vn/the-dung-quat-refinery-upgrade-project-enters-a-new-phase-of-development-34381
  11. Petrovietnam, Oil and gas firms post strong 2025 results (December 23, 2025). https://petrovietnam.vn/oil-and-gas-firms-post-strong-2025-results-32022
  12. Petrovietnam (PetroTimes), BSR successfully test-processes new crude oils: Murban and Cooper Basin (July 11, 2025). https://petrovietnam.petrotimes.vn/bsr-successfully-test-processes-new-crude-oils-murban-and-cooper-basin-729922.html
  13. Petrovietnam, PV GAS increases capacity of Thi Vai LNG terminal (April 9, 2026). https://petrovietnam.vn/pv-gas-increases-capacity-of-thi-vai-lng-terminal-33232
  14. Oil and Gas Journal, New Vietnamese refinery reaches full startup (December 12, 2018). https://ogj.com/refining-processing/refining/operations/article/17296750/new-vietnamese-refinery-reaches-full-startup
  15. Vietnam News, Nghi Son Refinery processes first non-Kuwaiti crude in feedstock diversification push (January 15, 2026). https://vietnamnews.vn/economy/1763832/nghi-son-refinery-processes-first-non-kuwaiti-crude-in-feedstock-diversification-push.html
  16. Vietnam News, BSR proactively secures domestic fuel supply amid escalating Middle East tensions (March 31, 2026). https://vietnamnews.vn/economy/1778492/bsr-proactively-secures-domestic-fuel-supply-amid-escalating-middle-east-tensions.html
  17. Hydrocarbon Processing, Vietnam's Nghi Son refinery secures crude supplies through November, mostly from Kuwait (October 2, 2026). https://hydrocarbonprocessing.com/news/2026/10/vietnams-nghi-son-refinery-secures-crude-supplies-through-november-mostly-from-kuwait/

All sources checked November 23, 2026.